When the evenings draw in and the weather turns, building work is probably the last thing on your mind. But if you’re picturing a new kitchen extension or an extra bedroom ready to enjoy next summer, winter is exactly when the real work should begin.

Most of what happens before a single brick is laid takes place on paper, and paperwork doesn’t mind the rain. In this post, we explain why starting your planning now can make all the difference to a spring build.

The Hidden Work Before Construction Starts

Many homeowners are surprised by how much needs to happen before the builders arrive. A typical extension project involves several stages that can each take weeks, and some of them can’t start until the previous one is finished.

  • Working out what you want and setting a budget
  • Commissioning measured surveys and design drawings
  • Applying for planning permission (if it’s needed)
  • Preparing building regulations drawings and structural calculations
  • Serving party wall notices where relevant
  • Getting quotes and agreeing a start date with a builder

Leave all of this until March and you may find that spring has turned into autumn before work can begin.

Design and Drawings

Getting Clear on Your Brief

The design stage is where your ideas become something buildable. It’s worth taking time over this — think about how you’ll use the space, where the light comes from, and how the new room connects to the rest of the house. Winter gives you the breathing space to make these decisions properly rather than in a rush.

Allow Time for Revisions

It’s rare for the first set of drawings to be the final set. Most people want a few tweaks once they see their plans on paper, and architects and designers are often busy themselves. Building in time for a couple of rounds of changes avoids pressure later on.

Planning Permission Lead Times

If your project needs planning permission, the clock really matters. Councils in England generally aim to decide householder applications within around eight weeks of the application being validated, but that’s a target rather than a guarantee. Validation itself can take time, and if the council asks for changes or extra information, things can take longer.

Even if you think your project falls under permitted development, it can be worth applying for a Lawful Development Certificate for peace of mind — and that takes time too. Your local council’s website or the Planning Portal will have current guidance, and it’s always worth checking as rules can change.

Building Regulations and Building Control

Planning permission and building regulations are two separate things. Almost every extension needs building regulations approval, which covers structure, fire safety, insulation, drainage and more. You’ll usually need detailed drawings and, in many cases, structural calculations from an engineer.

You can use your local authority’s building control service or a registered building control approver. Either way, submitting a full plans application in good time means the technical details are sorted before work starts, which helps avoid surprises on site. Our building regulations page explains more about how this part of the process works.

Getting on a Builder’s Schedule

Spring and summer are naturally the busiest times of year for builders. Many homeowners have the same idea at the same time, so good contractors tend to book up well in advance.

By getting in touch early, you can:

  • Talk through your plans while there’s time to refine them
  • Receive a detailed quote based on finished drawings
  • Agree a realistic start date that fits around approvals
  • Order any long-lead materials, such as windows or bifold doors, in good time

A builder who’s involved early can also flag practical issues with a design before it’s finalised, which can save time and money down the line.

What You Can Do This Winter

If you’re thinking about a spring or summer build, here’s a simple checklist to work through over the coming months:

  1. Decide what you want the extension to achieve
  2. Set a realistic budget, including a contingency
  3. Appoint a designer or architect and get drawings underway
  4. Check whether you need planning permission
  5. Submit your planning and building regulations applications
  6. Speak to builders and arrange quotes
  7. Book your start date

Final Thoughts

A successful build in the warmer months nearly always starts with careful planning in the colder ones. Using winter to get your designs, approvals and builder lined up means you’re ready to go as soon as the ground allows, rather than waiting in a queue.

Measom Building Services has been helping homeowners across North West Leicestershire since 1998. If you’re considering a home extension next year, get in touch and we’ll be happy to talk through your plans.

Back to all posts

Request A Free Consultation Today

We offer friendly advice, honest guidance and free consultations to help you get your project started. Get in touch today to discuss your plans.

More Tips & Advice

Message us on WhatsApp (opens in a new tab)